No | Job Description | Client & Sub Contractor | Year |
---|---|---|---|
1 | Supply Material For Cathodic Protection and Monitoring for TUNU Phase 9 Platform | TOTALFINAELF E&P. | 2003 |
2 | Supply Material For Cathodic Protection and Monitoring for TUNU Phase 9 Platform | TOTALFINAELF E&P | 2004 |
3 | Supply Material For Cathodic Protection for Pertamina Tanjung Priok Area | PERTAMINA DPPU SOEKARNO HATTA | 2004 |
4 | Supply of Cathodic Protection for Offshore Equipment for Unocal | UNOCAL - CHEMITRA JAYA | 2005 |
5 | Upgrade of Cathodic Protection Impress Current System & Internal Corrosion Monitoring Services Pertamina DPPU Soekarno - Hatta | PERTAMINA UPMS 3 | 2005 |
6 | Installation Cathodic Protection Protection Services Teras - Rambutan | MEDCO E&P INDONESIA | 2005 |
7 | Installation Cathodic Protection Sacrificial Anode for Soka - Teras | MEDCO E&P INDONESIA | 2005 |
8 | Supply of Cathodic Protection Material | AIR LIQUID INDONESIA | 2005 |
9 | Provision of In-Situ Flange Wrap Material & Services | BP WEST JAVA TLD / PT CLARIANT INDONESIA | 2005 |
10 | Replacement of Anode Retrofit Program | PREMIER OIL | 2006 |
11 | Installation Cathodic Protection Sacrificial Anode for Teras - Soka SSE Project 8" x 23 KM | MEDCO E&P INDONESIA | 2006 |
12 | Installation of Cathodic Protection SPBU Tank Storage Tol JKT - Merak KM 13 | PERTAMINA UPMS III | 2006 |
13 | Corrosion Protection Module for Subside Valve & Flange AT KLYA & KLYB Area | BP WEST JAVA | 2006 |
14 | Installation of Cathodic Protection Impress Current System Pipeline 16" Rambutan - GN Magang And Pipeline 8" Teras - Koneng | MEDCO E&P INDONESIA | 2007 |
15 | Installation of Cathodic Protection Impress Current System Pipeline 8" Teras - Koneng | MEDCO E&P INDONESIA | 2007 |
16 | Cathodic Protection Field Investigation Pipeline 16" x 17 KM Depot - JT Pasir Phase 1 & 2 | PERTAMINA DPPU SOEKARNO - HATTA | 2007 |
17 | Corrosion Protection Module for Subside Valve & Flange AT KLXA AREA | BP WEST JAVA | 2007 |
18 | Installation Proteksi Katodik Tanki Di Kaji Satelite | MEDCO E&P INDONESIA | 2007 |
19 | Corrosion Protection for Riser 16" AT Belanak WHPA & WHPB | CONOCOPHILLIPS INDONESIA | 2007 |
20 | Corrosion Protection Module for Subsides Valves &Flange AT KLXB Area | BP WEST JAVA | 2007 |
21 | Corrosion Protection Module for Subsides Valves & Flange AT Lima Area | BP WEST JAVA | 2007 |
22 | Installasi Sacrificial Anode Cahodic Protection ( SACP ) Fire Water Tank Kaji Satelit | MEDCO E&P INDONESIA | 2008 |
23 | Installasi Sacrificial Anode Cathodic Protection ( SACP ) Storage Tank Semoga FST, Kerang FST, Dan Kaji Satelit Serta Trunk Line Di Pipeline KM 102 | MEDCO E&P INDONESIA | 2008 |
24 | Visual Inspection for Armawrap Insatallation WHPA And WHPB Platform | SURVINDO/CONOPHILLIPS | 2008 |
25 | Supply of Sacrificial Anode for Gajah Baru Project | PREMIER OIL NATUNA SEA B.V | 2008 |
26 | Insalasi Cathodic Protection Impress Current System Pada Pipa Jalur I Dan 2 Dari Depot Ke Tanjung Pasir Di DPPU Soekarno - Hatta | PERTAMINA UPMS 3 | 2008 |
27 | Corrosion Protection Module for Subside Valve | BP WEST JAVA LTD | 2009 |
28 | Corrosion Protection Module for Subside Flange | BP WEST JAVA LTD | 2009 |
29 | BPO CP Retrofit West Java Project | BP WEST JAVA LTD | 2009 |
30 | SACP System for Hang Nadim Airport | PERTAMINA DPPU HANG NADIM, BATAM | 2009 |
31 | Supply DC II Probe | PT KAMBA SAMBILAN | 2009 |
32 | CP Retrofit Anode POD 2010 | PHE ONWJ LTD | 2010 |
33 | Alumunium Alloy Anode | PHE ONWJ | 2010 |
34 | Corrosion Protection Module for Flange | PHE ONWJ | 2010 |
35 | Maintenance & Repair Retroclamp | PHE ONWJ | 2010 |
36 | Jasa Pengadaan Material dan Instalasi Sistem Proteksi Katodik Pada 2" Fuel Line Kaji Comp - langkap FST Dan 4" OIL Trunkline KM 103 - Langkap FST Di Wilayah Kerja Rimau Asset Sumatera Selatan | MEDCO E&P INDONESIA | 2010 |
37 | CP Retrofit 2011 | PHE ONWJ | 2011 |
38 | Alumunium Anode Platform | CNOOC SES Ltd | 2011 |
39 | CP Retrofit 2011 & 2012 | PHE ONWJ | 2011 |
40 | CP Retrofit Design for Shallow Water Platform | PHE ONWJ | 2011 |
41 | FPSO CP Retrofit Study | PREMIER OIL | 2012 |
42 | Flangewraf For LSUB | PHE ONWJ | 2012 |
43 | Alumunium Anode for Conductor | TOTAL E&P INDONESIA | 2012 |
44 | Flangewrap for Lima | PHE ONWJ | 2012 |
45 | Cathodic Protection And Coating Application for FWKO tank, SSE Blok | MEDCO E&P INDONESIA | 2013 |
46 | Armawrap Survey Inspection | PREMIER OIL NATUNA SEA B.V | 2013 |
47 | Anode for Well Connection | TOTAL E&P INDONESIA | 2013 |
48 | Armawrap for Well Conductor | PREMIER OIL NATUNA SEA B.V | 2013 |
49 | CP Retrofit 2013 | PHE ONWJ | 2013 |
50 | Anode Sled for Pipeline CP Retrofit | PREMIER OIL NATUNA SEA B.V | 2013 |
51 | CP Rerofit 2013 | PHE WMO | 2013 |
52 | CP Rerofit Design for Platform | TOTAL E&P INDONESIA | 2014 |
53 | CP Rerofit for Platform | PHE WMO | 2014 |
54 | CP Retrofit for Subsea Pipeline | PREMIER OIL NATIRE SEA B.V | 2014 |
55 | Subsea CP Retropod | PHE ONWJ | 2014 |
56 | Anode for Separator | PHE ONWJ | 2014 |
57 | Anode for Platform | CNOOC SES LTD | 2014 |
58 | Anode for FSO | PHE ONWJ | 2014 |
59 | Provision of Cathodic Protection Maintenance & Retrofit And Corrosion Monitoring Services | PHE WMO | 2014 |
60 | Anode for River bank Repair | TOTAL E&P IDONESIA | 2014 |
61 | ZINC Anode for FPSO | PREMIER OIL NATURE SEA B.V | 2014 |
62 | Subsea CP Retfofod & Accessories | PHE ONWJ | 2014 |
63 | Provision of CP Sacrificial Anode Retrofit for Subsea Pipeline | PREMIER OIL NATUNA SEA B.V | 2014 |
64 | Anode & Bracket for Caisson PUMP | PREMIER OIL NATUNA SEA B.V | 2015 |